How much a Labour can excavate in a day?
That means, a hydraulic excavator can excavate 242.4242 m3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000.
How much can you dig in an hour?
Whether the hole is square and needs to be dug precisely for earth forming makes a difference, since you would need to allow for layout and measurements in your time estimate. For average digging conditions in ordinary soil, Trained users can move over 40 cubic yards in an hour with the Kubota 0.0m3 bucket capacity.
How long does it take to excavate soil?
Excavating contaminated soil may take as little as one day or as long as several years.
How do you calculate excavation rate?
The cost of excavation is generally estimated by multiplying the total excavation volume to the excavation price per unit. For ex : Let us assume that you want to excavate a pit of size : 2 x 2 x 2 meter.
How do you calculate excavated soil?
So, the formula is: Ab = Wb * Lb, where Wb and Lb are the width and length of the bottom of the excavation. At = Wt * Lt, where Wt and Lt are the width and length of the top of the excavation. In our example, Wb = Lb = 5 and Wt = Lt = 15, so Ab = 5 * 5 = 25 and At = 15 * 15 = 225, and D = 5.
How much cubic meter JCB can excavate?
The excavation capacity of the JCB ranges from 700 cu ft. to 1100 cu ft. per hour, depending upon the type of soil & bucket capacity. Let us consider an average excavation capacity of 900 cu ft./ hour for the calculation. But when we do the excavation practically, the JCB takes 3mins.
How much excavation can be done in a day by JCB?
The excavation capacity of the JCB ranges from 700 cu ft. to 1100 cu ft. per hour, depending upon the type of soil & bucket capacity.
How do you calculate volume of excavated soil?
To calculate the total excavated volume of a project, the entire project is divided into several horizontal layers. The area of a typical excavated cross-section in a horizontal layer is calculated and multiplied by the thickness of the layer. Thus, the excavated volume of this layer is obtained.
How much JCB can excavate in a day?
What is the quantity of excavation?
Excavation Calculation Volume of Excavation =Length×Width×Depth.
How much can a JCB excavate per hour?
How many pounds of soil can be removed in one hour?
For ordinary soil, that is, soil that isn’t packed hard or full of roots, rocks, or other debris, the 3 to 4 thousand pounds of soil can be removed by a single worker in a few hours. There isn’t an exact way to determine the actual time, since there are variables.
How big is one cubic meter of soil?
1 cubic meter = 61,024 cubic inches (per my unit converter on the www.) Based on my experience using manual labor to dig footers here in New Mexico in FIRM soil I’d estimate a 2-man Most residential footings are 24″ wide X 12″ deep/ but their depth to the top of the footing needs to exceed the frost depth.
How many hours does it take to manually excavate 1 cubic meter?
Based on my experience using manual labor to dig footers here in New Mexico in FIRM soil I’d estimate a 2-man crew (of hard-working immigrant workers) will dig about 150 l.f. per 10-day. So 20 man-hours / 150 l.f. 150 / 20 / = 7.5 man-hours per 50 l.f.; say 1 man, one 8-hour day can dig 1 cubic meter of footing.
How much does 1 cubic yard of concrete weigh?
Concrete, Scrap, Loose 1 cubic yard = 1,855 lbs Glass =1 cubic yard 2,160 lbs Gypsum, Dry Wall =1 cubic yard 3,834 lbs Metals =1 cubic yard 906 lbs Plastic =1 cubic yard 22.55 lbs Soil, Dry =1 cubic yard 2,025 lbs Soil, Wet =1 cubic yard 2,106 lbs Stone or Gravel 1 cubic yard = 2,632.5 lbs Rock, Loose 1 cubic yard = 2,570 lbs