Menu Close

How do I pay one off toll Brisbane?

How do I pay one off toll Brisbane?

To pay your toll please contact Linkt on 13 33 31 or at www.linkt.com.au/brisbane . Motorists may use their existing account arrangements with Linkt or any other Australian toll service provider to pay for their toll road travel in Queensland.

How do you pay toll for Gateway Bridge?

You can pay a Westlink M7 toll notice or top up your account online using a debit or credit card or BPAY. You can also pay in person in cash or pay over the phone.

How much is the Gateway Bridge Brisbane?

Toll pricing

Toll Point Class 1 Class 4
Go Between Bridge $1.68 $8.89 (off-peak^) $10.05 (peak^)
Clem7 $2.69 $14.23 (off-peak^) $16.12 (peak^)
Legacy Way $2.90 $15.35 (off-peak) $17.38 (peak^)
Bowen Hills to Kedron* $2.85 $15.09

Do you pay M6 toll both ways?

If you’re travelling along the M6toll heading further afield northbound or southbound, you’ll pay at one of two mainline toll plazas. If you’re driving northbound (e.g. towards Stafford or Telford M6/A34/M54) you’ll pass through our Great Wyrley toll plaza between junctions T6 & T7.

Is there a toll on the Gateway Bridge Brisbane?

The Gateway Motorway (M2 to Eight Mile Plains and M1 to Pine River) is a major tolled motorway in Brisbane, Queensland, Australia which includes the Sir Leo Hielscher Bridges (former Gateway Bridge). The motorway is operated by toll road operator Transurban.

Is the Go Between Bridge free?

Tolls will be removed on Brisbane’s Go Between Bridge for the residents of South Brisbane when work begins to make the Victoria Bridge car-free in mid-2021. Cars now pay a $3.29 toll while light commercial vehicles pay $4.94 on the 300-metre Go Between Bridge.

Is there a toll on Gateway bridge?

Tolls. The motorway has three toll points, the Murrarie, Kuraby and Compton Road toll points. The Murrarie toll point is located immediate south of the Sir Leo Hielscher Bridges and charges all vehicles travelling on the bridges.

Is there a toll on Gateway Bridge?

How much is the Legacy Way toll?

The toll in the 4.6-kilometre tunnel, connecting the Western Freeway with the Inner City Bypass, has risen from $3.90 to $4.85. The scheduled increase marks a significant price difference from the $3 when the tunnel opened in June last year. It rose to $3.90 in November.

Do you pay both ways on Dartford Crossing?

Northbound traffic uses the two, two-lane road tunnels known as the Dartford Tunnel. The tunnel was the only means of crossing before the bridge opened in 1991. A charge (toll) is payable in both directions.

Can you avoid the M6 Toll?

(Unless you’ve turned off toll roads in your nav system set-up, in which case you’ll automatically avoid it.) If you’re heading to or from the South West, you can’t use the M6 Toll because it doesn’t connect to the M5.

How much does the Gateway Bridge cost?

Tolls

Toll road Class 3 (Light Commercial Vehicles)
Gateway Motorway Murrarie toll point (Sir Leo Hielscher Bridges) $7.18
Kuraby and Compton Road toll points $4.24