A common “rule of thumb” is considering stopping the crane if the wind speed reaches 20 mph. Project managers and Appointed persons should reconsider lifts if the wind speed increases dangerously, even before it reaches 20 mph.

What is the maximum wind speed to operate a tower crane?

45 mph
The tower crane’s manual will specify the maximum wind speed at which the tower crane must be taken out of service. This is normally 45 mph (20 m/s, 72kph) and is based on the requirements of the tower crane design standards.

What is the safe working wind speed?

Operation in wind speeds above this maximum may cause instability. Under BS EN280:2001+A2:2009 (Mobile elevating work platforms – Design calculations – Stability criteria – Construction – Safety – Examinations and tests) the maximum design wind speed in which a MEWP can work is 12.5 m/s (28 mph).

Is an anemometer?

An anemometer is an instrument that measures wind speed and wind pressure. Anemometers are important tools for meteorologists, who study weather patterns. They are also important to the work of physicists, who study the way air moves.

What is the OSHA standards for wind speed?

OSHA (The Occupational Safety and Health Administration) normally considers winds that are exceeding 40 miles per hour as high winds. If the work involves material handling, high winds can be considered at 30 miles per hour, unless the employer takes precautions to protect employees from the hazards of the wind.

What is the maximum wind speed for working on a scaffold?

Once the stormy weather begins there is little that can be done other than wait for the wind to subside. It should go without saying that scaffolds should not be used (18 m/s or 40 mph being the usual maximum speed before work is stopped completely).

What is the max wind speed for using a Mewp?

28 mph
Operation in wind speeds above this maximum may cause instability. Under BS EN280:2001+A2:2009 (Mobile elevating work platforms – Design calculations – Stability criteria – Construction – Safety – Examinations and tests) the maximum design wind speed in which a MEWP can work is 12.5 m/s (28 mph).

What is a cup anemometer?

Cup anenometers are used to measure wind speed, or as in the case of of our anemometer, is used to totalize the amount of wind that has passed over a surface (referred to as a totalizing cup anemometer).

What is the maximum of wind speed to stop tower crane?

Safe wind speed to stop operating cranes: In general crane manufacturers, contractors and the Heath and Safety Executive recommend a maximum wind speed for tower cranes at 38mph (16.5m/s or 60kph) and completely prohibited over 20m/s (45mph or 72kph)

Is there a limit to wind speed?

So no there is no technical limit to wind speed as its decided by the general air pressure the weather patterns and the air patterns in the upper atmosphere.

How does wind turbulence affect cranes?

The same principle applies with turbulent wind, since it causes repetitive forces on cranes and structures. Even if a crane withstands the wind, the load and hook line tend to oscillate more with turbulence. This increases the risk of injuring workers or damaging the structure. Wind measurements improve safety in construction sites.

How can wind affect construction cranes?

The effects of wind on cranes can be both direct and indirect . The direct effect is the potential to affect the stability and/or structural integrity of the crane, while the indirect effects are wind forces causing the load on the hook to move suddenly. This in turn may lead to material falling or people being knocked over, perhaps from a height.