Which agency is responsible for conducting independent cost estimates for all ACAT ID?
In general, the Director of Cost Analysis and Program Evaluation (DCAPE) is the principal official for independent cost estimation and cost analysis, ensuring that the cost estimation and cost analysis processes of the DoD provide accurate information and realistic estimates of cost for the acquisition programs of the …
What is an Igce?
The IGCE is a cost estimate developed by the Government Requiring Activity, based on the requirements of the Performance Work Statement (PWS) or Statement of Work (SOW). An IGCE is required for every new acquisition that exceeds the simplified acquisition threshold (SAT).
Who prepares an independent government estimate?
14 FAH-2 H-350 INDEPENDENT GOVERNMENT COST ESTIMATE. (3) To serve as an objective basis for determining price reasonableness. b. The contracting officer’s representative (COR) prepares the IGCE.
What is a Program Office estimate?
A Program Office Estimate (POE) (also known as a Life-Cycle Cost Estimate) is a detailed estimate of acquisition and Total Ownership Costs (TOC) normally required for high-level decisions.
Which one of the following organizations is responsible for preparing independent cost estimates for all a cat ID programs?
For ACAT ID programs, the ICE is prepared by the DCAPE.
How is Igce calculated?
The IGCE can be calculated using prior historical rates and information. The IGCE should include detailed breakdowns of estimates for material and travel. If/when applicable, the IGCE should include methodology used for estimating the level of effort required.
What is an independent cost estimate?
Definition. A cost estimate, prepared by an organization independent of the project sponsor, using the same detailed technical and procurement information to make the project estimate. It is used to validate the project estimate to determine whether it is accurate and reasonable.
What is Cost Analysis Requirements Description card?
The Cost Analysis Requirements Description (CARD) is a complete, detailed description of a DoD program for use in preparing an ICE, POE, CCE, CCP, or other cost estimate, as required. The foundation of a sound cost estimate is a well-defined program, and the CARD is used to articulate details about the program.
What cost estimating technique would be?
Cost Estimating Techniques Parametric: The parametric technique uses regression or other statistical methods to develop Cost Estimating Relationships (CERs). A CER is an equation used to estimate a given cost element using an established relationship with one or more independent variables.
What method estimates costs from the bottom up using a detailed work breakdown structure?
The Engineering Cost Estimating method (Also called Bottoms-Up) builds the overall cost estimate by summing detailed estimates done at lower levels of the Work Breakdown Structure (WBS).
Who prepares the Ige?
IgE is produced by plasma cells located in lymph nodes draining the site of antigen entry or locally, at the sites of allergic reactions, by plasma cells derived from germinal centers developing within the inflamed tissue.
What are the different types of ACAT I programs?
ACAT I programs have three sub-categories: ACAT ID for which the Milestone Decision Authority (MDA) is the Defense Acquisition Executive (DAE), unless delegated. ACAT IB for which the MDA is the SAE, unless delegated. ACAT IB programs are managed by a Military Department. ACAT IC for which the MDAA is the CAE, unless delegated.
What’s the difference between ACAT ID and ACAT IB?
Programs, for which the SAE is the MDA by operation of Section 2430 of Title 10, U.S.C., will be designated within the DoD as ACAT IB programs to differentiate these programs from ACAT ID programs, where the USD (A&S) is the MDA, or ACAT IC programs, where the USD (A&S) as the DAE has delegated the DAE’s MDA to the SAE.
Is the MDAA the CAE for ACAT IC?
ACAT IC for which the MDAA is the CAE, unless delegated. ACAT IC programs are managed by a DoD Component other than a Military Department.
Who is the DA for ACAT IV program?
There are two categories of ACAT IV programs: IVT (Test) and IVM (Monitor). ACAT IVT programs require Operational Test and Evaluation (OT&E) while ACAT IVM programs do not. The DA for these programs is designated by the cognizant Program Executive Officer (Army), Direct Reporting Program Manager (DPRM), or Systems Command (SYSCOM) commander.